Loading
Government Department
Public-market contract exposure from NASA awards.
Total Awarded
$74B
Contracts
121
Linked Tickers
10
Latest Award
Jun 01, 2026
Top Recipient
BA - Boeing Co
Public companies linked to awards from this department.
| Ticker | Company | Total Awarded | Contract Count | Latest Award | Top Contract / Description |
|---|---|---|---|---|---|
| BA | Boeing Co | $38B | 11 | Jul 17, 2020 | INTERNATIONAL SPACE STATION |
| LMT | Lockheed Martin Corp | $25B | 30 | May 13, 2026 | TAS::80 0124::TAS DESIGN, DEVELOPMENT, TEST&EVALUATION OF PROJECT ORION |
| NOC | Northrop Grumman Corp | $7.7B | 18 | May 11, 2026 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS |
Monthly buckets from available contract records.
LOCKHEED MARTIN CORP
$75,000,000
Jun 10, 2026
DESIGN BUILD AND DELIVER 3 GEOXO SPACECRAFT
NORTHROP GRUMMAN SYSTEMS CORPORATION
$1,600,000
Jun 09, 2026
ICESAT-2 MISSION OPERATIONS CENTER (MOC) SUPPORT CENTER CONTRACT - PROVIDE HIGHLY SPECIALIZED ENGINEERING SERVICES FOR MISSION OPERATIONS SUPPORT TO MEET ICESAT-2 SCIENCE OBJECTIVES.
| RTX | RTX Corp | $1.7B | 9 | Sep 25, 2024 | ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE VISIBLE INFRARED IMAGER RADIOMETER (VIRS) INSTRUMENT AND SUPPORT. |
| SAIC | Science Applications International Corporation - Common Stock | $1.5B | 14 | Nov 01, 2024 | IGF::OT::IGF THIS EFFORT IS FOR A FOLLOW ON PROCUREMENT REQUIREMENT. THE NAME OF THIS PROCUREMENT IS THE OMNIBUS MULTIDISCIPLINE ENGINEERING SERVICES (OMES) II. THE PRINCIPAL PURPOSE OF THIS CONTRACT IS TO PROVIDE MULTIDISCIPLINE ENGINEERING SUPPORT SERVICES AND RELATED WORK TO EED, ISTD, SED, MSD, MESA, JPSS, SSCO, AND RELATED ORGANIZATIONS, AS REQUIRED, FOR THE STUDY, DESIGN, SYSTEMS ENGINEERING, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE AND SOFTWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. TO THIS END, THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE MULTIDISCIPLINE ENGINEERING SERVICES, PURSUANT TO TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS. TRAVEL MAY BE REQUIRED BY THE CONTRACTOR TO SUPPORT CERTAIN TASK ORDERS, THESE TRAVEL REQUIREMENTS WILL BE IDENTIFIED ON A TASK BY TASK BASIS. |
| LDOS | Leidos Holdings Inc | $357M | 5 | Apr 30, 2025 | INTERNATIONAL SPACE STATION PROGRAM'S CARGO MISSION CONTRACT 3 |
| CACI | CACI International Inc | $213M | 1 | Jul 03, 2024 | NASA CONSOLIDATED APPLICATION AND PLATFORM SERVICES (NCAPS) |
| BAH | Booz Allen Hamilton Holding Corporation | $91.7M | 31 | Jun 01, 2026 | STRATEGIC PROFESSIONAL ENGINEERING ASSESSMENT CONTRACT (SPEACII) - MOON TO MARS DEVELOPMENT ASSESSMENT |
| PLTR | Palantir Technologies Inc | $12.1M | 1 | Mar 02, 2026 | INTEGRATION OF SAFETY-RELATED DATA SOURCES, RISK FRAMEWORK DEVELOPMENT, AND COMPLIANCE WITH IL-5 SECURITY STANDARDS IN SUPPORT OF THE NASA MISSION AND MOON-TO-MARS OBJECTIVES. |
| GD | General Dynamics Corp | $5.0M | 1 | Mar 14, 2023 | ACQUISITION OF THE ATMOSPHERE OBSERVING SYSTEM-INCLINED (AOS-I) ATMOSPHERIC LIDAR INSTRUMENT FOR CLOUDS AND AEROSOL TRANSPORT (ALICAT) RECEIVER TELESCOPE |
PALANTIR USG INC
$10,000,000
Jun 05, 2026
INTEGRATION OF SAFETY-RELATED DATA SOURCES, RISK FRAMEWORK DEVELOPMENT, AND COMPLIANCE WITH IL-5 SECURITY STANDARDS IN SUPPORT OF THE NASA MISSION AND MOON-TO-MARS OBJECTIVES.
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION
$55,462
Jun 05, 2026
SYSTEMS AND SOFTWARE ASSURANCE SERVICES 2 (SAS2) THE PRINCIPLE PURPOSE OF THIS CONTRACT IS TO ACQUIRE SYSTEMS AND SOFTWARE ASSURANCE SERVICES, INCLUDING IV&V AND SAFETY AND MISSION ASSURANCE ANALYSIS ON SELECTED SYSTEMS AND SOFTWARE BEING DEVELOPED
LOCKHEED MARTIN CORP
$2,000,000
Jun 02, 2026
PHASE E MISSION OPERATIONS MANAGEMENT TO CARRY OUT MISSION PLANNING AND SATELLITE COMMUNICATIONS, WHICH INCLUDES MISSION TIMELINE AND SEQUENCE DEVELOPMENT, ENGINEERING DATA ANALYSIS, AND SCIENTIFIC DATA ACQUISITION AND DISTRIBUTION.
THE BOEING COMPANY
$69,500,000
May 29, 2026
SPACE LAUNCH SYSTEM (SLS) STAGES PRODUCTION AND EVOLUTION CONTRACT (SPEC), ESTABLISH CLIN 1 INCENTIVE MILESTONES, FUNDING, DPD UPDATE, DEI CLAUSE INCLUSION
BOOZ ALLEN HAMILTON INC
$1,191,250
May 29, 2026
THE CONTRACTOR SHALL PROVIDE PROGRAMMATIC SUPPORT AND IT MAINTENANCE FOR THE NASA BIOLOGICAL AND PHYSICAL SCIENCES (BPS) DIVISION.
BOOZ ALLEN HAMILTON INC
$1,950,000
May 28, 2026
THE CONTRACTOR WILL WORK WITH NASA AND AT NASA'S DIRECTION TO FORM A NASA SPACE APPS ORGANIZING TEAM TO SUPPORT AND EXECUTE THE SPACE APPS PROGRAM, INCLUDING SUPPORT AND OPERATION OF THE NASA SPACE APPS WEBSITE.
THE BOEING COMPANY
$1,500,000
May 28, 2026
PROVIDE DEVELOPMENTAL HARDWARE AND TEST ARTICLES, AND MANUFACTURE AND ASSEMBLE ARES 1 UPPER STAGE.
THE BOEING COMPANY
-$77,191
May 28, 2026
INTERNATIONAL SPACE STATION
THE BOEING COMPANY
$10,184,000
May 27, 2026
INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS).
NORTHROP GRUMMAN SYSTEMS CORPORATION
$5,000,000
May 27, 2026
SPACE LAUNCH SYSTEM (SLS) BOOSTER
THE BOEING COMPANY
$11,110,073,497
Nov 15, 1993
INTERNATIONAL SPACE STATION
LOCKHEED MARTIN CORP
$784,965,171
Nov 01, 2000
PRODUCTION AND O&M FOR 35 EXTERNAL TANKS
LOCKHEED MARTIN CORP
$691,284,000
Jan 27, 2015
ORION CREW EXPLORATION VEHICLE CONTRACT.
LOCKHEED MARTIN CORP
$585,647,686
Mar 11, 2014
ORION CREW EXPLORATION VEHICLE CONTRACT.
LOCKHEED MARTIN CORP
$563,000,000
Sep 21, 2006
DESIGN, DEVELOPMENT, TEST & EVALUATION OF PROJECT ORION
LOCKHEED MARTIN CORP
$477,505,557
Jan 20, 2016
ORION CREW EXPLORATION VEHICLE CONTRACT.
THE BOEING COMPANY
$456,820,624
Jan 31, 2020
PROVIDE DEVELOPMENTAL HARDWARE AND TEST ARTICLES, AND MANUFACTURE AND ASSEMBLE ARES I UPPER STAGES. THE UPPER STAGE (US) ELEMENT IS AN INTEGRAL PART OF THE ARES I LAUNCH VEHICLE AND PROVIDES THE SECOND STAGE OF FLIGHT. THE US ELEMENT IS RESPONSIBLE FOR THE ROLL CONTROL DURING THE FIRST STAGE BURN AND SEPARATION AND WILL PROVIDE THE GUIDANCE AND NAVIGATION, COMMAND AND DATA HANDLING, AND OTHER AVIONICS FUNCTIONS FOR THE ARES I DURING ALL PHASES OF THE ASCENT FLIGHT. THE US ELEMENT IS A NEW DESIGN THAT EMPHASIZES SAFETY, OPERABILITY, AND MINIMUM LIFE CYCLE COST. THE OVERALL DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E), PRODUCTION, AND SUSTAINING ENGINEERING EFFORTS INCLUDE ACTIVITIES PERFORMED BY THREE ORGANIZATIONS THE NASA DESIGN TEAM (NDT), THE UPPER STAGE PRODUCTION CONTRACTOR (USPC) AND THE INSTRUMENT UNIT PRODUCTION CONTRACTOR (IUPC). FOR CLARITY, THE USPC WILL BE REFERRED TO AS THE CONTRACTOR THROUGHOUT THIS DOCUMENT. NASA IS RESPONSIBLE FOR THE INTEGRATION OF THE PRIMARY ELEMENTS OF THE ARES I LAUNCH VEHICLE INCLUDING: THE FIRST STAGE, US INCLUDING INSTRUMENT UNIT (IU), AND US ENGINE AND WILL ALSO INTEGRATE THE ARES I LAUNCH VEHICLE AT THE LAUNCH SITE. NASA IS RESPONSIBLE FOR THE DDT&E, INCLUDING TECHNICAL AND PROGRAMMATIC INTEGRATION OF THE US SUBSYSTEMS AND GOVERNMENT-FURNISHED PROPERTY. NASA WILL LEAD THE EFFORT TO DEVELOP THE REQUIREMENTS AND SPECIFICATIONS OF THE US ELEMENT, THE DEVELOPMENT PLAN AND TESTING REQUIREMENTS, AND ALL DESIGN DOCUMENTATION, INITIAL MANUFACTURING AND ASSEMBLY PROCESS PLANNING, LOGISTICS PLANNING, AND OPERATIONS SUPPORT PLANNING. DEVELOPMENT, QUALIFICATION, AND ACCEPTANCE TESTING WILL BE CONDUCTED BY NASA AND THE CONTRACTOR TO SATISFY REQUIREMENTS AND FOR RISK MITIGATION. NASA IS RESPONSIBLE FOR THE OVERALL UPPER STAGE VERIFICATION AND VALIDATION PROCESS AND WILL REQUIRE SUPPORT FROM THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR THE MANUFACTURE AND ASSEMBLY OF THE UPPER STAGE TEST FLIGHT AND OPERATIONAL UPPER STAGE UNITS INCLUDING THE INSTALLATION OF UPPER STAGE INSTRUMENT UNIT, THE GOVERNMENT-FURNISHED US ENGINE, BOOSTER SEPARATION MOTORS, AND OTHER GOVERNMENT-FURNISHED PROPERTY. A DESCRIPTION OF THE NASA MANAGED AND PERFORMED EFFORTS IS CONTAINED IN THE US WORK PACKAGES AND WILL BE MADE AVAILABLE TO THE CONTRACTOR TO ENSURE THEIR UNDERSTANDING OF THE ROLES AND RESPONSIBILITIES OF THE NDT, IUPC, AND CONTRACTOR DURING THE DESIGN, DEVELOPMENT, AND OPERATION OF THE US ELEMENT. THE US CONCEPTUAL DESIGN DESCRIBED IN THE USO-CLV-SE-25704 US DESIGN DEFINITION DOCUMENT (DDD) IS THE BASELINE DESIGN FOR THIS CONTRACT. THE CONTRACTORS EARLY ROLE WILL BE TO PROVIDE PRODUCIBILITY ENGINEERING SUPPORT TO NASA VIA THE ESTABLISHED US OFFICE STRUCTURE AND TO PROVIDE INPUTS INTO THE FINAL DESIGN CONFIGURATION, SPECIFICATIONS, AND STANDARDS. NASA WILL TRANSITION THE MANUFACTURING AND ASSEMBLY, LOGISTICS SUPPORT INFRASTRUCTURE, CONFIGURATION MANAGEMENT, AND THE SUSTAINING ENGINEERING FUNCTIONS TO THE CONTRACTOR AT THE KEY POINTS DURING THE DEVELOPMENT AND IMPLEMENTATION OF THE PROGRAM CURRENTLY PLANNED TO OCCUR NO LATER THAN 90 DAYS AFTER THE COMPLETION OF THE FOLLOWING MAJOR MILESTONES: MANUFACTURING AND ASSEMBLY US PRELIMINARY DESIGN REVIEW (PDR) LOGISTICS SUPPORT INFRASTRUCTURE US PDR CONFIGURATION MANAGEMENT US CRITICAL DESIGN REVIEW CDR) SUSTAINING ENGINEERING US DESIGN CERTIFICATION REVIEW (DCR) AFTER THE COMPLETION OF AN ORDERLY TRANSITION OF ROLES AND RESPONSIBILITIES TO THE CONTRACTOR, NASA WILL ASSUME AN INSIGHT ROLE INTO THE CONTRACTORS PRODUCTION, SUSTAINING ENGINEERING, AND OPERATIONS SUPPORT OF THE ARES I US TEST PROGRAM AND FLIGHT HARDWARE. AFTER DCR, THE CONTRACTOR WILL BE RESPONSIBLE FOR SUSTAINING ENGINEERING PER SOW SECTION 4.7, AS NECESSARY TO MAINTAIN AND SUPPORT THE US CONFIGURATION AND FOR PRODUCTION AND OPERATIONS SUPPORT.
THE BOEING COMPANY
$380,835,008
Feb 16, 2021
PROVIDE DEVELOPMENTAL HARDWARE AND TEST ARTICLES, AND MANUFACTURE AND ASSEMBLE ARES I UPPER STAGES. THE UPPER STAGE (US) ELEMENT IS AN INTEGRAL PART OF THE ARES I LAUNCH VEHICLE AND PROVIDES THE SECOND STAGE OF FLIGHT. THE US ELEMENT IS RESPONSIBLE FOR THE ROLL CONTROL DURING THE FIRST STAGE BURN AND SEPARATION AND WILL PROVIDE THE GUIDANCE AND NAVIGATION, COMMAND AND DATA HANDLING, AND OTHER AVIONICS FUNCTIONS FOR THE ARES I DURING ALL PHASES OF THE ASCENT FLIGHT. THE US ELEMENT IS A NEW DESIGN THAT EMPHASIZES SAFETY, OPERABILITY, AND MINIMUM LIFE CYCLE COST. THE OVERALL DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E), PRODUCTION, AND SUSTAINING ENGINEERING EFFORTS INCLUDE ACTIVITIES PERFORMED BY THREE ORGANIZATIONS THE NASA DESIGN TEAM (NDT), THE UPPER STAGE PRODUCTION CONTRACTOR (USPC) AND THE INSTRUMENT UNIT PRODUCTION CONTRACTOR (IUPC). FOR CLARITY, THE USPC WILL BE REFERRED TO AS THE CONTRACTOR THROUGHOUT THIS DOCUMENT. NASA IS RESPONSIBLE FOR THE INTEGRATION OF THE PRIMARY ELEMENTS OF THE ARES I LAUNCH VEHICLE INCLUDING: THE FIRST STAGE, US INCLUDING INSTRUMENT UNIT (IU), AND US ENGINE AND WILL ALSO INTEGRATE THE ARES I LAUNCH VEHICLE AT THE LAUNCH SITE. NASA IS RESPONSIBLE FOR THE DDT&E, INCLUDING TECHNICAL AND PROGRAMMATIC INTEGRATION OF THE US SUBSYSTEMS AND GOVERNMENT-FURNISHED PROPERTY. NASA WILL LEAD THE EFFORT TO DEVELOP THE REQUIREMENTS AND SPECIFICATIONS OF THE US ELEMENT, THE DEVELOPMENT PLAN AND TESTING REQUIREMENTS, AND ALL DESIGN DOCUMENTATION, INITIAL MANUFACTURING AND ASSEMBLY PROCESS PLANNING, LOGISTICS PLANNING, AND OPERATIONS SUPPORT PLANNING. DEVELOPMENT, QUALIFICATION, AND ACCEPTANCE TESTING WILL BE CONDUCTED BY NASA AND THE CONTRACTOR TO SATISFY REQUIREMENTS AND FOR RISK MITIGATION. NASA IS RESPONSIBLE FOR THE OVERALL UPPER STAGE VERIFICATION AND VALIDATION PROCESS AND WILL REQUIRE SUPPORT FROM THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR THE MANUFACTURE AND ASSEMBLY OF THE UPPER STAGE TEST FLIGHT AND OPERATIONAL UPPER STAGE UNITS INCLUDING THE INSTALLATION OF UPPER STAGE INSTRUMENT UNIT, THE GOVERNMENT-FURNISHED US ENGINE, BOOSTER SEPARATION MOTORS, AND OTHER GOVERNMENT-FURNISHED PROPERTY. A DESCRIPTION OF THE NASA MANAGED AND PERFORMED EFFORTS IS CONTAINED IN THE US WORK PACKAGES AND WILL BE MADE AVAILABLE TO THE CONTRACTOR TO ENSURE THEIR UNDERSTANDING OF THE ROLES AND RESPONSIBILITIES OF THE NDT, IUPC, AND CONTRACTOR DURING THE DESIGN, DEVELOPMENT, AND OPERATION OF THE US ELEMENT. THE US CONCEPTUAL DESIGN DESCRIBED IN THE USO-CLV-SE-25704 US DESIGN DEFINITION DOCUMENT (DDD) IS THE BASELINE DESIGN FOR THIS CONTRACT. THE CONTRACTORS EARLY ROLE WILL BE TO PROVIDE PRODUCIBILITY ENGINEERING SUPPORT TO NASA VIA THE ESTABLISHED US OFFICE STRUCTURE AND TO PROVIDE INPUTS INTO THE FINAL DESIGN CONFIGURATION, SPECIFICATIONS, AND STANDARDS. NASA WILL TRANSITION THE MANUFACTURING AND ASSEMBLY, LOGISTICS SUPPORT INFRASTRUCTURE, CONFIGURATION MANAGEMENT, AND THE SUSTAINING ENGINEERING FUNCTIONS TO THE CONTRACTOR AT THE KEY POINTS DURING THE DEVELOPMENT AND IMPLEMENTATION OF THE PROGRAM CURRENTLY PLANNED TO OCCUR NO LATER THAN 90 DAYS AFTER THE COMPLETION OF THE FOLLOWING MAJOR MILESTONES: MANUFACTURING AND ASSEMBLY US PRELIMINARY DESIGN REVIEW (PDR) LOGISTICS SUPPORT INFRASTRUCTURE US PDR CONFIGURATION MANAGEMENT US CRITICAL DESIGN REVIEW CDR) SUSTAINING ENGINEERING US DESIGN CERTIFICATION REVIEW (DCR) AFTER THE COMPLETION OF AN ORDERLY TRANSITION OF ROLES AND RESPONSIBILITIES TO THE CONTRACTOR, NASA WILL ASSUME AN INSIGHT ROLE INTO THE CONTRACTORS PRODUCTION, SUSTAINING ENGINEERING, AND OPERATIONS SUPPORT OF THE ARES I US TEST PROGRAM AND FLIGHT HARDWARE. AFTER DCR, THE CONTRACTOR WILL BE RESPONSIBLE FOR SUSTAINING ENGINEERING PER SOW SECTION 4.7, AS NECESSARY TO MAINTAIN AND SUPPORT THE US CONFIGURATION AND FOR PRODUCTION AND OPERATIONS SUPPORT.
LOCKHEED MARTIN CORP
$360,156,252
May 01, 2018
ORION CREW EXPLORATION VEHICLE CONTRACT.
LOCKHEED MARTIN CORP
$357,228,830
Mar 27, 2019
ORION CREW EXPLORATION VEHICLE CONTRACT.
LOCKHEED MARTIN CORP
$334,929,870
Dec 15, 2016
ORION CREW EXPLORATION VEHICLE CONTRACT.
LOCKHEED MARTIN CORP
$300,535,892
Oct 15, 2003
PRODUCTION AND O&M FOR 35 EXTERNAL TANKS